Light Duty GGG500-7 Ductile Iron Water Meter Surface Valve Box Sand Castings EN124 Reference with Black Bitumen Painting

Share

Direct factory support

Get a quote that fits your project

Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.

  • Drawing & specification review

    Confirm the supply scope and critical requirements.

  • Samples before custom production

    Review inspected samples before approving a batch.

  • Inspection documents

    Agree material and dimensional records for your part.

Email your requirements[email protected]
Product description
  • Product name
    Customized Steel Casting Parts
  • Material
    Ductile Iron
    Dimensions
    according drawing
  • Application
    underground valves and hydrant
    Service
    Customized OEM ODM
  • Quality Control
    100% Inspection
    Certification
    CE ISO9001
  • Surface treatment
    Black bitumen painting
    Packaging Details
    polywood case or pallets

Light-duty water-meter, surface and valve-box enquiries cover ductile-iron sand castings with a GGG500-7 material reference. Select the actual underground-valve or hydrant component and establish its complete specification. Dimensions follow the customer drawing and required supplied condition.

Define the utility installation and load requirement

Identify the installed location, mounting arrangement and working interfaces of the selected box. For EN124 requirements, establish the applicable part, class and acceptance documents around that installation. Keep the actual load requirement connected to the chosen design and material designation.

Choose the component and final surface

Define ductile-iron supply separately from any steel-component request. Black-bitumen painting is named for the box; specify treated areas, appearance and final contact conditions. Mark dimensional limits and locating references where fit depends on the relationship between adjoining utility components.

Set checks and applicable documents

The stated 100% inspection needs specified characteristics, methods and records for component approval. Identify material, dimensional and finished-surface evidence required by the actual installation. Request applicable CE and ISO9001 documents with their holder and relevant scope.

  • OEM/ODM requests should identify box quantity and controlling revision.
  • Case or pallet packing is referenced; agree the selected package construction.
  • Define protection for the finished mounting and mating areas.
  • Retain accepted material and installation decisions with the utility-component order.

Use the agreed design and load criteria when confirming further surface or valve boxes.