Light Duty GGG500-7 Ductile Iron Water Meter Surface Valve Box Sand Castings EN124 Reference with Black Bitumen Painting
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
Product nameCustomized Steel Casting Parts
-
MaterialDuctile IronDimensionsaccording drawing
-
Applicationunderground valves and hydrantServiceCustomized OEM ODM
-
Quality Control100% InspectionCertificationCE ISO9001
-
Surface treatmentBlack bitumen paintingPackaging Detailspolywood case or pallets
Light-duty water-meter, surface and valve-box enquiries cover ductile-iron sand castings with a GGG500-7 material reference. Select the actual underground-valve or hydrant component and establish its complete specification. Dimensions follow the customer drawing and required supplied condition.
Define the utility installation and load requirement
Identify the installed location, mounting arrangement and working interfaces of the selected box. For EN124 requirements, establish the applicable part, class and acceptance documents around that installation. Keep the actual load requirement connected to the chosen design and material designation.
Choose the component and final surface
Define ductile-iron supply separately from any steel-component request. Black-bitumen painting is named for the box; specify treated areas, appearance and final contact conditions. Mark dimensional limits and locating references where fit depends on the relationship between adjoining utility components.
Set checks and applicable documents
The stated 100% inspection needs specified characteristics, methods and records for component approval. Identify material, dimensional and finished-surface evidence required by the actual installation. Request applicable CE and ISO9001 documents with their holder and relevant scope.
- OEM/ODM requests should identify box quantity and controlling revision.
- Case or pallet packing is referenced; agree the selected package construction.
- Define protection for the finished mounting and mating areas.
- Retain accepted material and installation decisions with the utility-component order.
Use the agreed design and load criteria when confirming further surface or valve boxes.





