Custom Steel Stainless Ductile Iron Housing Pump Impeller Parts with Sand Lost Wax Investment Casting and Optional Machining

Share

Direct factory support

Get a quote that fits your project

Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.

  • Drawing & specification review

    Confirm the supply scope and critical requirements.

  • Samples before custom production

    Review inspected samples before approving a batch.

  • Inspection documents

    Agree material and dimensional records for your part.

Email your requirements[email protected]
Product description
  • Size
    any
  • Surface Treatment
    Sandblasting, polishing, electrolysis
    Materials
    stainless steel/steel/Iron/Grey iron/Carbon steel
  • Product name
    sand investment LOST WAX PRECISION CASTING services
    Material
    SS304,316,2205,316)//Iron/Grey iron/Carbon steel GG25 HT250
  • Process
    Casting +Machining(if Need)+surface Treatment
    Certification
    ISO9001/TS16949/RoHS/CE
  • Keyword
    Precision investment LOST WAX PRECISION Casting products
    Quality Control
    100% Inspection
  • Delivery time
    15-60days
    Weight
    2g-100KG
  • Logo
    Accept Custom Logo
    OEM/ODM
    Warmly Welcomed

OEM/ODM housing and pump-impeller enquiries cover alloy steel, stainless steel and ductile iron, with separate iron, gray-iron and carbon-steel requests. Select sand or lost-wax/investment casting around the actual component. Custom sizes and logos can be defined with the drawing.

Choose the grade for the working component

Material references include SS304, 316 and 2205 for stainless selections, alongside GG25 and HT250 for the applicable gray-iron request. Identify the full governing standard and material condition. State the actual medium, operating conditions or rotating duty relevant to accepting the selected housing or impeller.

Locate interfaces and required surface work

Machining can be added where needed. Mark connection, mounting and working geometry with the datums and dimensional limits governing fit. Sandblasting, polishing and electrolysis-related surface work are named; define the actual treatment, coverage and final result for the selected substrate.

  • Provide quantity and the controlled component revision.
  • Specify logo artwork and placement where requested.
  • Identify material, dimensional and surface records.
  • Define the initial component’s approval task.

Set inspection and conformity scope

The stated 100% inspection should address agreed characteristics of the selected housing or impeller. Assign checks and reporting to its required material, geometry and supplied condition. Identify the functional areas covered by each selected method and report. Request applicable ISO9001, TS16949, RoHS and CE documentation with the actual component or supplier scope, retaining the accepted definition throughout production approval.