Custom Steel Stainless Ductile Iron Housing Pump Impeller Parts with Sand Lost Wax Investment Casting and Optional Machining
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
Sizeany
-
Surface TreatmentSandblasting, polishing, electrolysisMaterialsstainless steel/steel/Iron/Grey iron/Carbon steel
-
Product namesand investment LOST WAX PRECISION CASTING servicesMaterialSS304,316,2205,316)//Iron/Grey iron/Carbon steel GG25 HT250
-
ProcessCasting +Machining(if Need)+surface TreatmentCertificationISO9001/TS16949/RoHS/CE
-
KeywordPrecision investment LOST WAX PRECISION Casting productsQuality Control100% Inspection
-
Delivery time15-60daysWeight2g-100KG
-
LogoAccept Custom LogoOEM/ODMWarmly Welcomed
OEM/ODM housing and pump-impeller enquiries cover alloy steel, stainless steel and ductile iron, with separate iron, gray-iron and carbon-steel requests. Select sand or lost-wax/investment casting around the actual component. Custom sizes and logos can be defined with the drawing.
Choose the grade for the working component
Material references include SS304, 316 and 2205 for stainless selections, alongside GG25 and HT250 for the applicable gray-iron request. Identify the full governing standard and material condition. State the actual medium, operating conditions or rotating duty relevant to accepting the selected housing or impeller.
Locate interfaces and required surface work
Machining can be added where needed. Mark connection, mounting and working geometry with the datums and dimensional limits governing fit. Sandblasting, polishing and electrolysis-related surface work are named; define the actual treatment, coverage and final result for the selected substrate.
- Provide quantity and the controlled component revision.
- Specify logo artwork and placement where requested.
- Identify material, dimensional and surface records.
- Define the initial component’s approval task.
Set inspection and conformity scope
The stated 100% inspection should address agreed characteristics of the selected housing or impeller. Assign checks and reporting to its required material, geometry and supplied condition. Identify the functional areas covered by each selected method and report. Request applicable ISO9001, TS16949, RoHS and CE documentation with the actual component or supplier scope, retaining the accepted definition throughout production approval.





