S25 Resin Sand Production Line Reclamation and Molding Plant for Foundry Process Enquiries
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
machine typefoundryvideo outgoing-inspectionProvided
-
machinery test reportProvidedcore componentsPLC, Engine, Motor
-
voltageaccording to customer's requireementpower(w)7.5KW(10.06hp)
-
dimension(l*w*h)3000*1200*2200mm(118.11*47.24*86.61in)warranty1 Year
-
key selling pointsEasy to Operateweight (kg)15000
-
ConditionNewAfter-sales Service ProvidedEngineers available to service machinery overseas
-
namesand production linecoloraccording to your requirement
-
Voltage380V /220V/440V or customizedWeight1750kg
-
CertificationISO CE
The S25 resin-sand production-line enquiry covers reclamation and molding-plant requirements for a selected foundry process. Define the equipment role, sand and binder system, and package scope. The actual production target and surrounding line determine the utility, control and installation interfaces to review.
Match the electrical and spatial requirements
Use the selected equipment configuration to establish the installation drawing and supply arrangement. The listed references provide a basis for that review.
- Voltage choices: 380 V, 220 V, 440 V or customized.
- Power reference: 7.5 kW (10.06 hp).
- Dimensions: 3000 × 1200 × 2200 mm.
- Named core components: PLC, engine and motor.
Define the process and operator interfaces
Provide the incoming sand condition, required production scope and upstream/downstream handling arrangement. Identify the controls, access and operating requirements for the selected plant package. Color follows customer requirements, and the installation layout should establish the actual space and connection boundaries.
Set acceptance and service arrangements
Video outgoing inspection and a machinery test report are provided. Identify the checks and records needed to accept the selected equipment, together with the applicable ISO and CE documents and scope. Warranty is referenced at one year, and engineers are available for overseas machinery service with actual arrangements to be agreed. Connect service and acceptance requirements to the supplied configuration and the foundry installation rather than an undefined general line package.


