Automatic Double Arm Continuous Furan Phenolic Foundry Sand Mixer with Q235 Steel Construction and 380V Supply
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
machine typecontinuous casting machine, Automatic Foundry, foundry machineryvideo outgoing-inspectionProvided
-
machinery test reportProvidedcore componentsPLC, Bearing, Gearbox, Gear, Pump, Motor
-
voltage380Vpower(w)Determined based on the equipment model
-
dimension(l*w*h)Determined based on the equipment modelwarranty1 Year
-
key selling pointsRemote debugging, easy to operate, long service liweight (kg)5000
-
MaterialQ235 SteelProduct nameFoundry Sand Mixer
-
ApplicationCast iron componentsWarranty1 Year
Automatic double-arm continuous sand mixers are offered for furan- or phenolic-sand foundry work associated with cast-iron components. Q235 steel is listed for the equipment, with 380 V supply. Define the binder system and mixing task for the foundry arrangement being planned.
Choose the mixer model around the task
Available choices are S255, S258, S2510, S2515D, S2520A and S2530. Power and overall dimensions depend on the selected model. Provide the required mixing capacity, delivery position and available space so the equipment proposal can address the actual foundry layout.
Define movement, controls and adjoining equipment
Show the positions the double-arm arrangement must serve and the plant interfaces needed around it. Listed core components include PLC, bearing, gearbox, gear, pump and motor. Identify their roles within the selected mixer configuration and distinguish the mixer supply from any adjoining casting-line equipment.
- Specify the intended sand and binder requirements.
- Identify operating access and control expectations.
- Agree electrical connections for the selected model.
- Define the mixing and operating checks needed for approval.
Review operation and remote support
Remote debugging and easy operation are listed. Agree the controls and support arrangements relevant to those functions. An outgoing-inspection video and machinery test report are provided, with a one-year warranty subject to agreed terms. Keep the accepted configuration, mixing task and evidence requirements together as the basis for equipment acceptance.



