Stainless Steel Silica Sol Lost Wax Investment Casting CNC Parts with Separate Sand Mold Fabrication Enquiries
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
NameStainless Steel Casting Parts Casting Services
-
MaterialStainless SteelSurface treatmentNo cape burr sand hole
-
KeywordLarge supply of silica sol casting partsQuality Control100% Inspection
-
Machining ProcessLost Wax+CNC MechiningLead Time15-35 Days
-
SurfacePerfect Appearance
Stainless-steel component enquiries include silica-sol investment or lost-wax casting with CNC machining. Separate iron, sand- or die-casting, mold and metal-fabrication requests need their own material and route definition. Specify the actual part, complete grade and required supplied condition for quotation.
Define the CNC interfaces from the assembly
Mark locating surfaces, mating dimensions and any contact geometry requiring a finished interface. Identify the datum relationships and acceptance limits used to measure those areas. Distinguish them from surfaces approved in the cast condition so the requested machining work has a clear component-specific purpose.
Make appearance acceptance concrete
Burr, flash and sand-hole control are stated surface considerations. Provide an agreed visual reference or criteria for the faces that matter to the component’s use. Describe any areas where surface condition affects assembly, handling or the required appearance of the finished part. Include reference photographs where particular faces require visual approval.
- Provide the drawing revision and order volume.
- Identify the requested material condition.
- Mark cast and CNC-finished areas.
- Define dimensional and visual approval records.
Connect inspection to the chosen deliverable
The stainless component’s 100% inspection scope should be defined around its material, finished geometry and visual acceptance. Agree the actual checks and records required for that order. Mold or fabrication requests should have their own drawings, supplied-state definition and approval criteria, allowing each quoted deliverable to be evaluated against the work actually requested.
