GG20 Grey Iron and Separate Ductile Iron Industrial Sand Castings to German American Standard Drawing Requirements

Share

Direct factory support

Get a quote that fits your project

Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.

  • Drawing & specification review

    Confirm the supply scope and critical requirements.

  • Samples before custom production

    Review inspected samples before approving a batch.

  • Inspection documents

    Agree material and dimensional records for your part.

Email your requirements[email protected]
Product description
  • Product name
    Custom Casting Parts
  • Size
    Customer's Reuqest
    Surface treatment
    Customers' Demand
  • Service
    OEM ODM Customised
    Certification
    ISO9001:2015
  • Standard
    Customers' Drawings
    Inspection
    100% Inspection CMM
  • Dimensions
    Customized Sizes
    Drawing Format
    2D/(PDF/CAD)3D(IGES/STEP)
  • Casting Tolerance
    Drawing Requiry

Industrial sand-casting enquiries include GG20 gray iron and separately specified ductile iron. OEM/ODM sizes, casting tolerances and surface treatment follow customer requirements. German- or American-standard requests should identify the actual governing document for the selected component.

Select the iron family and complete grade

State the material designation, document edition and required condition. Show how the casting functions in its intended industrial assembly. Connect the grade selection to the component’s working requirements, keeping each material request attached to its own drawing.

Make customized geometry measurable

Mark mounting, locating and contact interfaces with the datums controlling their relationships. Put the applicable dimensional limits on the drawing and identify the supplied state in which they are assessed. Include the treatment boundaries needed where surface work affects fit or appearance.

Assign CMM inspection to the acceptance brief

The stated 100% inspection with CMM should address the agreed controlled dimensions and records for the selected iron casting. Define measurement conditions and reporting requirements. Request applicable ISO9001:2015 documentation and scope alongside the component-specific inspection plan.

Provide a usable drawing and approval package

Submit 2D PDF or CAD information, or 3D IGES or STEP files. Include quantity and identify the controlling revision. Explain the purpose of any initial sample and the material, dimensional and surface evidence needed to approve it, maintaining that component definition through the production order.