OEM Custom Aluminum Zinc Alloy Sand Mold Casting Service with Drawing Defined Tolerances and Finish
Direct factory support
Get a quote that fits your project
Send your drawing or product reference, material grade and required quantity. Relia will review the requirements with you.
- Drawing & specification review
Confirm the supply scope and critical requirements.
- Samples before custom production
Review inspected samples before approving a batch.
- Inspection documents
Agree material and dimensional records for your part.
-
Product nameSand Casting Service
-
Raw matrialsAluminium alloy/Zinc alloySurfact treatmentPainting/Anodizing/Powder coating/Electrophoresis
-
TypeOEM/ Customized/TailorToleranceAccording to the drawings
-
CertificateISO2009MOQNegotiated
-
Lead timeUpon to the quantitiesInspection100% Inspection before Shipping
-
PackageExport package
Custom nonferrous sand-mold and casting enquiries include aluminum or zinc alloy, with tolerances defined by the component drawing. Identify the full grade and requested supplied condition. The enquiry should state whether the order concerns mold work, a casting or a finished component.
Define what is to be supplied
For mold work, identify the component geometry and the actual molding requirement. For a casting or further-finished item, show the mounting and mating interfaces that govern acceptance. The drawing should distinguish the cast form from any additional work requested to make the part ready for assembly.
- Provide the controlled drawing and order quantity.
- State the complete alloy and required material condition.
- Mark functional datums and finished dimensions.
- Identify material, dimensional and appearance approval records.
Specify the selected surface treatment
Painting, anodizing, powder coating and electrophoresis are named finish choices. Define the actual treatment and masking areas for the selected material. Include the contact-surface condition needed after finishing, alongside the visual acceptance of exposed areas.
Align inspection, quantity and packing
The supplied-part scope states 100% inspection before shipping. Identify the checks and records required for the actual drawing and delivered condition. Minimum order is negotiated, scheduling depends on quantity and export packing is named. Establish the actual document and scope for the ISO2009 qualification designation, and connect any sample approval to the same component definition used for the order.
